Member Price:
RM 71.10
Normal Price:
RM 79.00
Stock Status:
Available
Average Ratings:
Not Rated
Quantity
Additional Information
Suggested Age:
13 and up
No. of Players:
2 - 6
Game Duration:
120 minutes
Designer:
Friedemann Friese
Publisher:
Rio Grande Games
Published:
2019

Power Grid: Middle East/South Africa (Recharged Version)
More Views:
Description Reviews (0)

Power Grid: Middle East/South Africa is a pair of expansion maps for Power Grid!

1) For decades, there has been an abundance of oil in the Middle East. However, in the near future the so-called "peak oil" threatens this area: This is the point in time when the output of the oil wells begins to decrease. Already, a few countries of this region have nuclear power plants, and that number will increase in the future as the amount of oil from the wells diminishes. Most likely, other energy sources will play a part, too, such as the recycling of plastic waste.

The players start the game with an excessive supply of oil. Additionally, the players have access to plenty of natural gas (using the coal tokens of the base game) and a few solar plants (the green power plants). However, at the start of the game the players cannot buy nuclear or garbage power plants.

During Step 2, the abundance of oil and natural gas will run dry. Both nuclear and garbage power plants will then be available as alternatives. Thus, in the middle of the game the players are forced to adjust their power plant mix.

2) The energy supply in South Africa is executed almost exclusively by a single trust, which is the seventh biggest energy supplier in the world measured against the production of energy. Roughly 90% of the energy is produced in coal power plants. Additionally, South Africa uses a few nuclear power plants and both water and wind ecological power plants.

Because of its size, the trust also supplies half of the rest of Africa with energy. Thus, the game board contains six international power connections and a lot of available coal.


*NOTE* This is not the full game, Power Grid is required for play.

Sleeves:
Confirmation
Alert
No
Yes